Highmark Stadium

Buffalo Engineering has provided a wide range of MEP/FP engineering services for numerous projects beginning in 2003. Our work has included: 

  • $130 Million Stadium Renovation: Key projects were the new 33,500 sf, $4.1 million Commissary Building; new 13,000 sf, $2.5 million Operations Building; concessions stand renovations; post-game interview room renovation; and restroom renovations.

  • Fieldhouse/Training Center: Includes new fire alarm system, new storage addition, new domestic hot water pressure booster system, new emergency generator, replacement of hot water boilers with condensate type units, and training center server room cooling system upgrades.

  • Annual Capital Improvement Projects (2003 – Present): Upgrades, improvements and equipment replacement involving all areas of the stadium. Project costs typically average $3-$3.5 million per year.

  • 2003, 2009, 2020 Building Condition Surveys